by JoBarwin | Oct 27, 2022
Project: Compayne Gardens, London Client: Private Client Barwin were appointed to take back the brick and stonework on the top floor of this beautiful residential property in Compayne Gardens, NW6 and completely rebuild. We undertook pointing to brickwork, repairs to...
by JoBarwin | Oct 27, 2022
Project: 150 – 155 Sloane Square, London Client: Cadogan Estates Barwin were appointed by Chorus Group on behalf of Cadogan Estates to undertake stone and brick façade repairs and cleaning by means of the DOFF system to this period residential property in Chelsea....
by JoBarwin | Oct 27, 2022
Project: Carlton Lodge, Belgravia, London Client: Bowood Ltd Barwin were appointed by Bowood Ltd on behalf of the resident’s association to undertake stone façade repairs, concrete repairs and façade redecorating of this period residential property within Belgravia...
by JoBarwin | Oct 19, 2022
Project: KOKO Camden, London Client: Make One Group The building was originally The Camden Theatre, and first opened on Boxing Day 1900. With a capacity of 2,434 it was one of the largest theatres in London outside the West End. The theatre was designed by the...
by JoBarwin | Oct 19, 2022
Project: Waterside Shopping Centre, Lincoln Client: Walker Wood Chartered Building Surveyors Barwin were delighted to appointed to carry out works at the Waterside Shopping Centre in Lincolnshire, as well as be Principle Contractor. The works entailed the careful...